December 02, 2014
Brightlec we’re contacted to provide a design and electrical plan for the conversion of the existing warehouse space into a commercial kitchen and cold stores facility.
Brightlec provided a full report, breakdown of work required and an estimation of time needed.
Brightlec provided the installation of sub-main power supply to a 3 phase distribution board in the kitchen. There was the installation of a steel tray containment system above the false ceiling for routing of the cabling, as well as the installation of single and 3 phase power supplies to all necessary equipment throughout the kitchen.
After the work was completed a NICEIC certification was issued.